Sidewalk Construction/Work
Area: N/A Sidewalk Replacement east of Lobby entrance to Dieke Building Start Date: September 28, 2023 End Date: October 4, 2023 Parking is Not Applicable No Additional Comments Posted By: Daniel Scott CSR (dws236@psu.edu)
Sidewalk Construction/Work
Area: OPP Ramp East Side Various concrete patchwork and caulking to the OPP ramp/loading dock east side outside Area 1 shop Start Date: September 25, 2023 End Date: October 6, 2023 Parking is Not Applicable No Additional Comments Posted By: Joe McNichol/Grounds Masonry Hardscape Planner (jem166@psu.edu)
Temporary Sidewalk Closure
Area: Sidewalk between Old Main and Henderson Building Closure to be at sanitary manhole 304, located adjacent to the existing sidewalk. Start Date: October 5, 2023 End Date: October 6, 2023 Times: From 8:00 AM to 5:00 PM each day. Parking is Not Applicable Additional Comments: Temporary sidewalk closure to complete sanitary lateral scoping effort. Temporary closure will be approximately 4 hours during either Thursday, 10/5, or Friday, 10/6. Signage will be provided to route pedestrians away from the closure. Posted By: Facilities Project Manager (tjp5136@psu.edu)
Parking Closure
Area: Portion of Red A Lot A portion of the Red A lot at Hallowell Building will be closed during this time. Start Date: October 10, 2023 End Date: October 10, 2023 Times: From 7AM to 3PM each day. Parking is Blocked Additional Comments: Additional notification will be provided by the Parking Office. Posted By: chad illig/Construction Service Representative (cri103@psu.edu)
Sidewalk Construction/Work
Area: Sidewalks South Side Davey Lab and North Side McAllister Excavate, concrete and brick paver infill 2 empty tree pits. Start Date: October 2, 2023 End Date: October 12, 2023 Parking is Not Applicable No Additional Comments Posted By: Joe McNichol/Grounds Masonry Hardscape Planner (jem166@psu.edu)
Sidewalk Construction/Work
Area: Sidewalk East side Beam Hall Installation of concrete bike pad east side of Beam Hall. Start Date: October 9, 2023 End Date: October 13, 2023 Parking is Not Applicable No Additional Comments Posted By: Joe McNichol/Grounds Masonry Hardscape Planner (jem166@psu.edu)
Road Closing
Area: Pollock Rd Failing steam tunnel in need of immediate repairs. Pollock Rd will be closed from the intersection of the access rd to Henderson building to the temporary construction access rd to N. Frear construction site. Access will remain open to the Henderson Building. Start Date: October 9, 2023 End Date: October 20, 2023 Parking is Not Applicable No Additional Comments Posted By: Kevin Roach - Utilities Planner/Estimator (dkr5449@psu.edu)
PARKING
Area: RED A RED A PARKING ON NORTH SIDE OF RESEARCH WEST BLDG. (4) PARKING SPOTS WILL BE OFF LINE FOR CONSTRUCTION LAY DOWN AREA. Start Date: July 28, 2023 End Date: October 31, 2023 Parking is Blocked No Additional Comments Posted By: Mike Brown CSR (msb35@psu.edu)
Parking
Area: Red H Noll (3) Parking Spots in RED H Noll Lab will be blocked Start Date: July 31, 2023 End Date: October 31, 2023 Parking is Blocked No Additional Comments Posted By: Mike Brown CSR (msb35@psu.edu)
Reduced Lanes
Area: Fischer Road The center lane of Fischer road will be used for Westward traffic in front of Moore Building. Start Date: August 4, 2022 End Date: September 30, 2024 Parking is Not Applicable Additional Comments: Two way traffic will not be impacted Posted By: Chad illig/Construction Service Representative (cri103@psu.edu)
Reduced Lanes
Area: Pollock Road (Henderson Mall) Work on Pollock Road, between the access gates, will be taking place starting the week of 5/31. The North lane of Pollock, between the gates, will be closed and remain closed for the duration of the project. Select,two-way traffic access through gate on South lane of Pollock only. Yield to oncoming traffic in this area. Various sidewalks near Osmond, Davey, Whitmore, South Frear, Buckhout and Bouke labs will be closed and detoured due to utility-related work in the vicinity. Please follow all vehicle/pedestrian/bike detours and signage. Start Date: May 9, 2022 End Date: December 31, 2024 Parking is Blocked Additional Comments: Brown Lot C (Behind Osmond Lab) The Brown C parking lot, behind Osmond Lab will be closed, with access to the Brown B parking lot and Brown C (Ritenour) remaining available through a detoured route. Posted By: Mike Brown CSR (msb35@psu.edu)
Permanent Road Closing
Area: Shortlidge Road from Pollock to Eisenhower Auditorium Shortlidge Road from Pollock to Eisenhower Auditorium is permanently closed. Access to Ritenour Parking lot is now via a new road from Osmond Lab traveling between Boucke and the Telecom Building.
Permanent Parking Lot Closing
Area: Lot Red H Lot Red H - west side of Rec Hall south gym, accessed from Atherton street will be permanently closed on 04-01-2005. The lot is the site of the new Rec Hall Wrestling and Student Fitness Center. Parking spaces have been relocated at the west and south sides of Noll Lab, accessed from Burrows Rd.
To subscribe yourself to the Road Closing mailing list, send mail to listserv@lists.psu.edu with subscribe RoadC-L in the body of the email
To unsubscribe yourself from the Road Closing mailing list, send mail to listserv@lists.psu.edu with unsubscribe RoadC-L in the body of the email
To subscribe yourself to the ElmTree Spraying mailing list, send mail to listserv@lists.psu.edu with subscribe Elmtree-L in the body of the email
To unsubscribe yourself from the ElmTree Spraying mailing list, send mail to listserv@lists.psu.edu with unsubscribe Elmtree-L in the body of the email